Sarawak Quay Planning Is Open!
PENGHANTARAN SARAWAKRIVER QUAY STACK
PORT KLANGSEA PASSAGEKUCHING / BINTULU
RIVER QUAY STACK / 22

Stack every decision before the vehicle reaches the quay.

A Sarawak-focused route desk for terminal, physical vehicle class, sea method, validated sailing and condition proof.

Vehicle at a Malaysian quay prepared for Sarawak shippingPKG ⇄ KCH / BTU
QUAY SLABS / 01

Six quay slabs form one complete movement.

Each slab resolves one operational decision before handover.

Q1

Origin pickup

Name town and land scope.

Q2

Port Klang terminal

Choose Northport or Westport.

Q3

Sea method

Keep RORO and container separate.

Q4

Kuching / Senari

Confirm the named arrival port.

Q5

Bintulu

Use only when the route names it.

Q6

Named receiver

Close the custody trail.

RATE BAYS / 02

Read the physical class before the planning figure.

Published starting figures are references; the accepted quotation confirms terminal, dimensions, slot and final scope.

BAY 01

Motorcycle

from RM1,100
BAY 02

Sedan / hatchback

from RM1,895
BAY 03

SUV / MPV / 4×4

from RM1,965
BAY 04

Large vehicle

Confirm dimensions
Open the complete rate board ↗
METHOD STACK / 03

RORO and container occupy different cargo bays.

Container

Alignment, restraint and seal form a separate file.

Open method ↗
STAIR FILE / 04

Six steps descend from route brief to named release.

01

Route brief

Name origin and arrival.

02

Vehicle profile

Record type and condition.

03

Method

Match accepted sea handling.

04

Sailing

Use validated carrier records.

05

Inspection

Retain comparable evidence.

06

Release

Name the receiver.

CUSTODY STRIPS / 05

Condition proof stays beside the custody stack.

P1 · Evidence retained
P2 · Evidence retained
P3 · Evidence retained
P4 · Evidence retained
P5 · Evidence retained
Open the Survey Report stack ↗
REFERENCE SLABS / 06

Open a reference slab without losing the route.

WHATSAPP QUAY DESK

Share origin, vehicle profile, arrival port and preferred month.

Build my Sarawak stack